Edit an Integration

Modify and update your existing integrations.

Editing is how an integration keeps up with the estate. Credentials rotate, accounts and clusters get added, and the refresh cadence that suited a stable system is wrong for one under active migration. Each of those is an edit, and each one changes what the architecture model contains.

Schedule is the one worth revisiting deliberately: it sets how stale the model is allowed to get between runs.

Edit an integration

  1. Go to Integrations under General in the left sidebar and select the integration.
  2. On the Settings tab, change what you need, then click Save in that section:
    • Configuration: the integration's name and its settings, such as account details or regions.
    • Schedule: how often the integration runs on its own, Daily or Every X days (1 to 30). The section also shows the next run and the last automatic run.

The Details section shows the integration's type and when it was created, modified, and last run. To remove the integration, use Delete integration under Integration administration. See Delete an Integration.


Did this page help you?